In South Australia, building work is licensed by Consumer and Business Services (CBS). Most people who want to run their own residential jobs need two things: a building work contractor’s licence for the business, and building work supervisor registration for the person who oversees the work. This guide explains both, and where the Cert IV in Building and Construction fits.

Licence or registration: which do you need?
  • Building work contractor’s licence. Needed to carry on business as a building work contractor, including contracting to do building work for others.

  • Building work supervisor registration. Approves you to supervise building work. A licensed contractor must have a registered supervisor approved by CBS, and companies must nominate one when they apply.

Employees working for a licensed builder don’t need their own licence, unless they are the nominated supervisor. Your licence number will start with BLD, and it must appear on domestic building contracts.

Supervisor registration: qualifications and experience

CBS publishes minimum experience by qualification pathway. For residential building work (NCC Class 1 and 10, such as houses, sheds and garages), the pathways are:

  • Pathway 1: 3 years. A trade apprenticeship (such as carpentry or bricklaying) plus the CPC40120 Cert IV or higher, plus extra units that depend on the storey limit.

  • Pathway 2: 4 years. A trade apprenticeship.

  • Pathway 3: 5 years. The CPC40120 Cert IV or higher, without a trade qualification.

  • Pathway 4: 6 years. No formal qualification.

All residential conditions require five completed projects, and you need evidence of on-site experience at the storey level you apply for (for example, not exceeding one, two or three storeys). You record this on the CBS Work History and On-Site Experience Record.

Applicants who meet the evidence requirements then attend a technical interview at CBS, which tests your building knowledge against the performance criteria. If you can’t show enough knowledge and experience, you won’t be offered an interview.

Contractor licence: business requirements
  • the relevant qualification, knowledge and experience

  • a current National Police Certificate

  • meeting solvency requirements

  • at least $10,000 in net assets

  • for major residential construction, a certificate of eligibility for building indemnity insurance

For the business knowledge requirement, CBS lists units of competency covering business finances, legal and risk, planning building work, estimating, contracts and dispute resolution. CBS also accepts a Certificate IV in Building (with academic record) as one option, so check how your Cert IV maps to these units.

Why the Cert IV matters in SA

The CPC40120 Cert IV cuts the experience you need for supervisor registration. With a trade apprenticeship and the right extra units, the minimum drops to 3 years, compared with 6 years with no qualification. Its planning, estimating, contracts and legal units can also help with the contractor licence.

Where EdVenture Global helps

We help with the qualification side of licensing. EdVenture Global is an education consultancy, not a registered training organisation (RTO) or a licensing body. We work with RTOs that assess and issue the qualification.

  • checking which qualification and units your licence class needs

  • matching you with an RTO for RPL

  • organising your evidence: work history, photos, references and documents

  • following up until your certificate is issued, including any gap training

We don’t issue licences, guarantee outcomes, sit interviews or exams for you, or lodge regulator forms on your behalf.

Your SA checklist
  1. Choose your licence and supervisor condition on the CBS website.

  2. Check your pathway: trade, Cert IV, extra units and years of experience.

  3. Get the Cert IV through RPL if you don’t have it yet.

  4. Complete the Work History and On-Site Experience Record, covering at least five projects.

  5. Get a National Police Certificate (no more than 12 months old) and organise your finances and insurance.

  6. Apply online with CBS and prepare for the technical interview.

Official links

General information current as of November 2026, not legal advice. CBS makes the final decision on every application, so always check the current requirements before you apply.

Looking at other states? Read our builder’s licence guide for every state.

Check your Cert IV eligibility in Adelaide →

In South Australia, building work is licensed by Consumer and Business Services (CBS). Most people who want to run their own residential jobs need two things: a building work contractor’s licence for the business, and building work supervisor registration for the person who oversees the work. This guide explains both, and where the Cert IV in Building and Construction fits.

Licence or registration: which do you need?
  • Building work contractor’s licence. Needed to carry on business as a building work contractor, including contracting to do building work for others.

  • Building work supervisor registration. Approves you to supervise building work. A licensed contractor must have a registered supervisor approved by CBS, and companies must nominate one when they apply.

Employees working for a licensed builder don’t need their own licence, unless they are the nominated supervisor. Your licence number will start with BLD, and it must appear on domestic building contracts.

Supervisor registration: qualifications and experience

CBS publishes minimum experience by qualification pathway. For residential building work (NCC Class 1 and 10, such as houses, sheds and garages), the pathways are:

  • Pathway 1: 3 years. A trade apprenticeship (such as carpentry or bricklaying) plus the CPC40120 Cert IV or higher, plus extra units that depend on the storey limit.

  • Pathway 2: 4 years. A trade apprenticeship.

  • Pathway 3: 5 years. The CPC40120 Cert IV or higher, without a trade qualification.

  • Pathway 4: 6 years. No formal qualification.

All residential conditions require five completed projects, and you need evidence of on-site experience at the storey level you apply for (for example, not exceeding one, two or three storeys). You record this on the CBS Work History and On-Site Experience Record.

Applicants who meet the evidence requirements then attend a technical interview at CBS, which tests your building knowledge against the performance criteria. If you can’t show enough knowledge and experience, you won’t be offered an interview.

Contractor licence: business requirements
  • the relevant qualification, knowledge and experience

  • a current National Police Certificate

  • meeting solvency requirements

  • at least $10,000 in net assets

  • for major residential construction, a certificate of eligibility for building indemnity insurance

For the business knowledge requirement, CBS lists units of competency covering business finances, legal and risk, planning building work, estimating, contracts and dispute resolution. CBS also accepts a Certificate IV in Building (with academic record) as one option, so check how your Cert IV maps to these units.

Why the Cert IV matters in SA

The CPC40120 Cert IV cuts the experience you need for supervisor registration. With a trade apprenticeship and the right extra units, the minimum drops to 3 years, compared with 6 years with no qualification. Its planning, estimating, contracts and legal units can also help with the contractor licence.

Where EdVenture Global helps

We help with the qualification side of licensing. EdVenture Global is an education consultancy, not a registered training organisation (RTO) or a licensing body. We work with RTOs that assess and issue the qualification.

  • checking which qualification and units your licence class needs

  • matching you with an RTO for RPL

  • organising your evidence: work history, photos, references and documents

  • following up until your certificate is issued, including any gap training

We don’t issue licences, guarantee outcomes, sit interviews or exams for you, or lodge regulator forms on your behalf.

Your SA checklist
  1. Choose your licence and supervisor condition on the CBS website.

  2. Check your pathway: trade, Cert IV, extra units and years of experience.

  3. Get the Cert IV through RPL if you don’t have it yet.

  4. Complete the Work History and On-Site Experience Record, covering at least five projects.

  5. Get a National Police Certificate (no more than 12 months old) and organise your finances and insurance.

  6. Apply online with CBS and prepare for the technical interview.

Official links

General information current as of November 2026, not legal advice. CBS makes the final decision on every application, so always check the current requirements before you apply.

Looking at other states? Read our builder’s licence guide for every state.